Reresve Study JULY 2001 |
-
BUILDINGS - Roof, Pump House
- Roof, Kitchen
- Structural (non fire)
- Electrictcal
- Plumbing+Appliances
- Misc.
|
- Repair
Cost - 2,000
- 2,000
- 5,000
- 1,000
- 2,000
- 1,000
|
|
|
- Required
Reserve - 1,733
- 133
- 500
- 100
- 400
- 250
|
-
POOL - Concrete Deck
- Pool Liner
- Circulation pump
- Solar Pump
- Solar Panels
- Piping
- Misc.
|
- Repair
Cost - 5,000
- 5,000
- 500
- 500
- 10,000
- 5,000
- 5,000
|
|
|
- Required
Reserve - 556
- 1,250
- 63
- 188
- 2,000
- 1,000
- 1,250
|
-
GROUNDS - Playground Equipment
- Walks, Walls
|
|
|
|
|
| | | | |
| | | |
| Above produced by SWAG method and accepted engineering principles July, 2001. |